Cascade controlΒΆ

Each Controller has the variables order and level with the default value 0. Both variables enable the possibility to operate different controllers in a specific sequence. This operation is called a cascade control. Following flow chart explains the general usage.

../_images/cascade_control.svg
Controller Order Level
Controller A 1 1,2
Controller B 2 2